Concentrator Infrastructure
Partnership with Stefanutti: 5,500m³ concrete, 3,600m² formwork, 6,500m³ fill.
Bulk Excavation: 10,000m³ fill, 550m³ concrete.
- Portal 6: Tunnel lining, 4,000m³ concrete, 7,000m² formwork.
- Portal 3: Surface infrastructure, 2,100m³ concrete, 1,800m² formwork.
- Underground Crusher: 1,200m³ concrete, 53 tons rebar, 700m² formwork.
- Rebar: 191 tons
- Concrete: 6,000m³
- Fill Material: 8,000m³
- Precast Shelverts: 1,000m³ concrete
- Insitu Concrete: 3,500m³
- Mass Concrete: 6,000m³
- Rebar: 450 tons
- Concrete: 4,000m³
- Backfill: 150m³
- Excavation: 100,000m³ black cotton soil
- Concrete: 9,000m³
- Bulk Earthworks: 300,000m³
- 1-Bed Units: 361
- 2-Bed Units: 91
- 3-Bed Units: 158
- Core Houses: 34
Zimplats Mupani Mine: Underground workshop and ore handling civils
Zimplats SMC: Tailings return water dam
FRGM Tailings storage facility and associated infrastructure